top of page

How to Measure Your Yard for Sod: Square Footage and Ordering Tips

1 hour ago
5 min read

To measure your yard for sod, break the lawn area into simple shapes (rectangles, triangles and circles), measure each one in feet, calculate the square footage of each shape, add them up, subtract beds, patios and other areas that won't get sod, then add a small allowance for cuts and edges. Divide the total by the square footage of one roll from your supplier to get the number of rolls. Winter is a good time to do this for a spring install, because you can get quotes and book a delivery date before the busy season.


Ordering the right amount of sod matters more than it does for most materials. Sod is a living product. It's cut fresh, should be laid as soon as it arrives, and can't sit on a pallet for days while you go back for more. This guide shows you how to measure accurately, how to handle awkward shapes, and how to plan the soil prep that goes underneath.


What You'll Need


  • A long measuring tape (100 ft is ideal) or a measuring wheel

  • Graph paper or a phone sketch app

  • A calculator

  • Stakes or flags to mark edges

  • A helper, which makes long measurements much easier


Step 1: Sketch the Lawn Area


Walk the yard and draw a rough outline of where the new lawn will go. Mark:


  • The house, garage, driveway and walkways

  • Garden beds, trees and planters you're keeping

  • Patios, decks, sheds and play areas

  • Slopes, swales and low spots

  • Access points for the delivery truck and pallets


Don't worry about making it perfect. The sketch just helps you divide the yard into shapes you can measure.


Step 2: Break the Yard Into Simple Shapes


Most lawns can be split into a few basic shapes. Measure each one and use these formulas:


Shape

What to measure

Formula

Rectangle or square

Length and width

Length × Width

Triangle

Base and height

(Base × Height) ÷ 2

Circle

Radius (centre to edge)

3.14 × Radius × Radius

Half circle

Radius

(3.14 × Radius × Radius) ÷ 2

Irregular curve

See Step 3

Offset method


Example


Say your backyard is a 40 ft × 30 ft rectangle, with a 12 ft × 10 ft patio and a 6 ft radius circular garden bed inside it:


  1. Backyard: 40 × 30 = 1,200 sq ft

  2. Patio: 12 × 10 = 120 sq ft

  3. Garden bed: 3.14 × 6 × 6 = about 113 sq ft

  4. Lawn area: 1,200 − 120 − 113 = 967 sq ft


Step 3: Measure Curves and Odd Shapes


Curved beds and irregular edges are where most people under-order. Two methods work well.


The offset method


  1. Run a straight baseline along the longest side of the irregular area.

  2. Every 5 or 10 ft along the baseline, measure straight out to the curved edge.

  3. Average those offset measurements.

  4. Multiply the average by the baseline length.


The closer together your offsets, the more accurate the result.


The "box it" method


For small, odd-shaped areas, measure the smallest rectangle that fits around the shape and use that number. You'll order a little extra, but in tight spots that extra usually gets used in cuts.


Person holding a tape measure in their hand

Step 4: Subtract What Won't Get Sod


Take away the area of anything inside your measured shapes that won't be sodded:


  • Patios, walkways, decks and sheds

  • Garden beds and tree rings

  • Mulched areas and stone borders

  • Play structures with a different surface


Step 5: Add an Allowance for Cuts and Waste


Even careful installers lose some sod to cuts around curves, beds, trees and edges. As a rule of thumb, add a little extra:


  • Simple rectangular lawns: a small allowance, around 5%

  • Lawns with curves, beds and many edges: more, often around 10%


Ask your installer what allowance they use for your yard's layout.


Step 6: Convert Square Feet to Rolls or Pallets


Roll and pallet sizes vary by sod farm. Ask your supplier:


  • How many square feet are in one roll?

  • How many rolls, or square feet, are on a pallet?

  • Is there a minimum order or delivery charge?


Then divide your total square footage, including the allowance, by the roll size. Round up. SPM's material calculators can help you check the numbers, and our sod page explains what we supply and install.


Don't Forget the Soil Underneath


Measuring for sod also tells you how much topsoil you need. Sod needs a good layer of loose topsoil to root into, and most failures start with poor soil or bad grading, not the sod itself.


Grading first


Before you lay sod, the grade should slope away from the house. The City of London recommends a 2% slope away from the foundation and warns against filling swales. See the City's flooding prevention tips and our guide to lot grading in London.


Topsoil volume


To estimate topsoil, multiply your lawn area by the depth you need, then convert to cubic yards:


Cubic yards = (Square feet × Depth in inches) ÷ 324


For example, 967 sq ft at 4 inches deep: (967 × 4) ÷ 324 = about 12 cubic yards.


Talk to your installer about the right depth for your yard, and check the topsoil when it arrives: it should be loose, dark and free of rocks, roots and debris.


Planning a Spring Sod Install in Southwestern Ontario


Late November through February is planning season. Use it to:


  1. Measure while the yard is clear, before spring growth hides edges and low spots.

  2. Decide on grading or drainage fixes that need to happen first.

  3. Get quotes for sod, topsoil and installation.

  4. Book a delivery window. Sod should be laid the day it arrives, so you'll want a crew ready.

  5. Plan watering. New sod needs steady water for its first weeks. Read our new sod care guide.


Still deciding between sod and seed? See Sod vs. Seed in Southwestern Ontario.


Measuring Checklist


  • ☐ Sketch the yard with all features marked

  • ☐ Divide into rectangles, triangles and circles

  • ☐ Measure each shape in feet

  • ☐ Use the offset method for curves

  • ☐ Subtract patios, beds and other non-sod areas

  • ☐ Add a cut and waste allowance

  • ☐ Ask the supplier for roll and pallet size

  • ☐ Calculate topsoil volume

  • ☐ Book delivery for a day you can lay it


FAQ


How do I calculate how much sod I need?


Measure the lawn area in square feet by breaking it into simple shapes, add them together and subtract areas that won't get sod. Add a small allowance for cuts, then divide by the square footage of one roll from your supplier and round up.


How much extra sod should I order?


A common rule of thumb is about 5% extra for simple rectangular lawns and around 10% for yards with curves, beds and many edges. Ask your installer what allowance they recommend for your layout.


How many square feet are in a roll of sod?


It depends on the sod farm. Ask your supplier for the roll size and how many rolls are on a pallet before you calculate your order.


How much topsoil do I need under new sod?


Multiply the lawn area in square feet by the depth in inches and divide by 324 to get cubic yards. Your installer can recommend the right depth based on your existing soil and grading.


When should I order sod for a spring install in Ontario?


Measure and get quotes in winter, then book delivery for once the ground has thawed and dried enough to grade. Sod should be laid the day it's delivered, so plan the delivery around your installation crew.


Get a Free Sod Quote


SPM Landscape & Excavation supplies and installs sod and delivers topsoil across London and southwestern Ontario. We've operated since 2006, we're WSIB covered and we carry $1M liability insurance. Call (519) 474-0008 or email spmlandscape@gmail.com, or send us your measurements for a free quote.


Comments


(519) 474-0008

©2022 by S.P.M Landscape

bottom of page