Our Sod Installation Process
We don't just lay grass over dirt. A lasting lawn requires meticulous preparation. Here is exactly how we guarantee your sod takes root successfully:
01
Site Clearing & Old Turf Removal
We excavate and remove all existing weeds, old dead grass, and debris. This creates a clean slate and prevents old growth from choking your new turf.
02
Sub-Grade Prep & Excavation
We address any existing drainage or pooling issues by grading the soil away from foundations and hardscapes, ensuring proper runoff.
03
Topsoil & Leveling
We bring in and evenly spread a fresh layer of nutrient-rich topsoil. This is screen-leveled to create a perfectly smooth, level surface for the sod to rest on.
04
​Precision Sod Laying
​Using fresh, locally sourced premium blend sod, we lay the rolls tightly together, staggering the seams like brickwork to eliminate gaps and visible lines.
Post Install Sod Care
Days 1 to 14: The Rooting Phase
-
Watering: Water 2 to 3 times daily (morning, afternoon, and early evening). The goal is to keep the sod and the topsoil underneath consistently damp, like a wrung-out sponge.
​
-
Stay Off the Grass: Keep heavy foot traffic, kids, and pets off the lawn entirely. The ground will be soft, and footprints will create permanent dips.
Days 15 to 30: The Establishment Phase
​
-
Check the Roots: Gently tug on a corner of a sod roll. If it resists, the roots are successfully bonding!
​
-
Taper Watering: Cut back to watering once a day, transitioning toward deeper, less frequent soakings to encourage the roots to grow deeper.
​
-
The First Mow: Once the grass reaches roughly 3.5 to 4 inches tall, you can take your first pass. Set your mower deck high (do not cut more than one-third of the grass blade height) and ensure your blades are razor-sharp.