Asphalt vs. Concrete vs. Interlock Driveways in London, Ontario
For most London, Ontario homes, the choice comes down to budget, looks and how much maintenance you're willing to do. Asphalt usually costs the least up front and is easy to repair, but it needs sealing every few years. Concrete is rigid and long-lasting, but it can crack and is sensitive to de-icing salt. Interlock pavers cost more but look the best, and individual pavers can be lifted and reset. Whatever you choose, the gravel base underneath and City of London rules on driveway width and curb cuts matter as much as the surface.
Winter is a good time to plan a spring driveway project. You can compare materials, get quotes and sort out permits before the paving season starts. This guide compares the three main driveway surfaces for southwestern Ontario's freeze-thaw climate and explains the City of London rules you need to know.
Asphalt, Concrete and Interlock Compared
**** | Asphalt | Concrete | Interlock pavers |
|---|---|---|---|
Up-front cost | Usually lowest | Usually mid to high | Usually highest |
Lifespan claims | Up to about 20 years well maintained (industry source) | Concrete pavements average 30 to 50 years (industry source, roads) | Long-lasting if the base is right; varies by product |
Maintenance | Seal every 2 to 5 years; patch cracks | Seal joints; avoid early salt use | Top up joint sand; reset settled pavers |
Freeze-thaw behaviour | Flexible, can crack and pothole over time | Rigid, can crack and scale | Flexible joints handle movement |
Repairs | Patches are visible but easy | Hard to patch invisibly | Lift and reset individual pavers |
Salt sensitivity | Moderate | High, especially in the first winter | Moderate; some products are more resistant |
Looks | Plain black | Plain or decorative finishes | Many colours, shapes and patterns |
Ready to drive on | Fast | Needs curing time | Usually right away |
Cost depends heavily on size, access, base work, removal of the old driveway and material choice. We don't publish set prices because every driveway is different. Get a free quote for your property.
About those lifespan numbers
Lifespan claims vary, so here's where they come from. The Colorado Asphalt Pavement Association's driveway guide says a well-maintained asphalt driveway can give "trouble-free service for up to 20 years," with sealer every 2 to 5 years. The Portland Cement Association says concrete pavements average 30 to 50 years of service, but that figure is for roads, not driveways. We didn't find an independent lifespan figure for interlock driveways. In every case, the base and drainage decide how long a driveway lasts in Ontario, more than the surface.
Asphalt Driveways
Pros
Usually the lowest up-front cost
Quick to install and drive on
Flexible, so it tolerates some ground movement
Dark surface sheds snow faster in sun
Cons
Needs sealing every few years
Edges crumble without proper support
Cracks and potholes develop over time, especially where water sits
Plain appearance
Concrete Driveways
Pros
Long service life when installed and cared for properly
Smooth, bright surface
Decorative options such as stamped or exposed aggregate finishes
Cons
Cracks are hard to repair invisibly
Sensitive to de-icing salt, especially when new
Needs curing time before it can be used
Lifting from frost heave can cause trip edges. See Frost Heave in London, Ontario
Interlock Paver Driveways
Pros
Best appearance and the most design options
Individual pavers can be lifted and reset, which makes repairs and utility access easier
Joints let the surface flex with freeze-thaw movement
Permeable paver systems can let water soak through
Cons
Usually the highest up-front cost
Joint sand needs topping up, and weeds can appear in joints
Settles if the base isn't built properly
Plow blades can catch edges if they aren't set right
Our guide to interlock base prep that survives freeze-thaw goes deeper. Thinking about permeable pavers on clay? Read Permeable Pavers on Clay Soil in London, Ontario.

The Part Nobody Sees: Base and Drainage
All three surfaces fail early on a weak base. In London's clay-heavy soils, a good driveway base usually includes:
Excavation below the frost-susceptible topsoil and organic material
Geotextile fabric where the subgrade is soft
Compacted granular base, placed and compacted in layers
Grading so water runs away from the house and off the driveway, not onto a neighbour's lot
Edge support so the sides don't crumble
SPM delivers granular base materials. See our gravel products page.
City of London Rules for Driveways
Width limits under Zoning By-law Z.-1
Under Section 4.19 of the City of London Zoning By-law Z.-1, for typical residential lots:
The minimum driveway width is 2.7 m for single, semi-detached, duplex and converted two-unit dwellings.
On lots up to 12.0 m wide, total driveway width is capped at 50% of the lot frontage or 6.0 m, whichever is less.
On lots over 12.0 m wide, the cap is 50% of frontage or 8.0 m, whichever is less.
No lot may have more than two driveways within the first 30 m of street line.
The rest of the required front yard, apart from walkways and driveways, must be landscaped open space. Parking on the front lawn isn't allowed.
Driveways need a stable surface that controls dust, such as asphalt, concrete, treated crushed stone or another hard surface. Drainage must not pool or flow onto neighbouring lots.
Widening or a new curb cut needs City approval
According to the City's common homeowner projects page, widening a driveway or cutting a curb needs an application. Email streetpermit@london.ca. Work in the City's road allowance, including the boulevard and sidewalk, needs a Work Approval Permit. The City asks for at least 7 days' notice and can take 7 business days to review. If work is done without a permit or not as approved, the homeowner may have to pay for replacement.
Before widening, check for trees, hydrants, poles, storm drains and mailboxes in the way. Always request utility locates through Ontario One Call before digging.
Which Driveway Is Right for You?
Tight budget, practical needs: asphalt on a well-built base
Clean look, long service life, light salt use: concrete
Curb appeal, easy repairs, design options: interlock
Heavy runoff or drainage concerns: interlock or permeable pavers, with proper base and grading
Rural lane or long driveway: consider gravel. SPM delivers bulk gravel for rural driveways.
FAQ
Which driveway lasts longest in Ontario?
Concrete pavements have a long average service life, and well-maintained asphalt driveways can last up to about 20 years according to industry sources. Interlock lasts well when the base is built right. In Ontario's freeze-thaw climate, base construction and drainage matter more than the surface.
Do I need a permit to widen my driveway in London, Ontario?
Yes, widening a driveway or making a new curb cut needs City approval. Email streetpermit@london.ca for an application, and get a Work Approval Permit for any work in the City's road allowance.
How wide can my driveway be in London?
Under Zoning By-law Z.-1, total driveway width is capped at 50% of lot frontage or 6.0 m on lots up to 12 m wide, and 50% of frontage or 8.0 m on wider lots, whichever is less. The minimum width is 2.7 m.
Is interlock good for driveways in a cold climate?
Yes, when the base is designed for freeze-thaw. The joints let the surface flex, and individual pavers can be lifted and reset if they settle.
When should I book a driveway project?
Plan and get quotes in winter, then book installation for spring to fall when the ground isn't frozen and materials can be placed and compacted properly.
Plan Your Driveway with SPM
SPM Landscape & Excavation does excavation, base prep, grading and hardscaping across London and southwestern Ontario. We've operated since 2006, we're WSIB covered and we carry $1M liability insurance. Call (519) 474-0008 or email spmlandscape@gmail.com for a free quote. Browse our photo gallery for past work.




Comments