top of page

Excavation Checklist for Ontario Homeowners and Builders: Locates, Excess Soil and Site Prep

Oct 4
4 min read

Every great build starts with a hole in the ground done right. Whether you're adding a garage, digging for an addition, prepping a lot for a new home, trenching for services or clearing space for a backyard project, excavation is where schedules and budgets are won or lost. This checklist covers what homeowners and builders in London and Southwestern Ontario need to sort out before the machine shows up.


1. Request utility locates (it's the law)


Before any digging in Ontario, you must contact Ontario One Call. Under the Ontario Underground Infrastructure Notification System Act, passed in 2012, anyone digging in the province has to request locates first, even homeowners on private property. The service is free.


  • Request online at ontarioonecall.ca or call 1-800-400-2255.

  • Submit the request at least five business days before your dig date.

  • Homeowners can request by phone; contractors are expected to use the online portal.


Why it matters: underground lines in Ontario are damaged more than 3,900 times a year, about 17 incidents every workday, and Ontario One Call's 2025 research found 57 percent of homeowners didn't request a locate before their last digging project, according to the City of Kingston. Note that public locates don't cover private lines, such as wiring to a detached garage or a pool heater, so plan for those separately.


2. Confirm permits and approvals


  • Building permits. Additions, garages, foundations and many accessory structures need a building permit from your municipality. In London, start with the City's building permits page.

  • Pools. Inground pools in London require a pool fence permit that includes a grading and drainage plan.

  • Conservation authority permits. Work near rivers, creeks, wetlands, valleys or the Lake Huron shoreline may need a permit from the local conservation authority. Ontario Regulation 41/24 governs development in these hazard areas.

  • City property. Work in the road allowance or boulevard may need City approval.


3. Plan where the soil is going


Excavation creates a lot of material, and in Ontario that material is regulated. Ontario Regulation 406/19 governs on-site and excess soil management.


  • Reuse soil on site for backfill and grading wherever possible. It's cheaper and simpler.

  • The province's 2024 amendments exempt very small projects, those generating or reusing 5 cubic metres or less, from hauling records, according to Landscape Ontario.

  • Larger volumes need records showing where soil came from and where it went, and very large projects have registry and planning requirements.

  • As of January 2025, excess soil that meets Ontario's quality standards is restricted from being landfilled, which pushes projects toward reuse.


A good excavation contractor will have a soil plan before digging starts.


Excavation crew in safety vests reviewing a residential site plan beside heavy equipment

4. Check soil and water conditions


  • Clay is common around London and Middlesex. It holds its shape for digging but drains poorly and can soften when wet.

  • Groundwater in low areas or near creeks may mean pumping and slower progress.

  • Frost depth matters for footings. In the London area, designs commonly put footings around 4 feet below grade; your engineer and permit drawings set the exact depth.

  • Trench safety. Deep excavations must follow Ontario's construction safety regulations for sloping or shoring. Never let anyone work in an unsupported deep trench.


5. Plan access and protect the property


  • Measure gates and side yards. Compact excavators and skid steers fit where full-size machines can't.

  • Identify trees, septic systems, wells, irrigation and buried lines to protect.

  • Plan a route for trucks and a spot to stockpile topsoil separately from subsoil.

  • Consider ground protection mats on lawns and driveways.


6. Plan the finish before you start


The best time to think about final grade, drainage and landscaping is before the first scoop.


  • Where will water go once the project is done? See our guide to lot grading in London.

  • Do you need French drains, catch basins or sump discharge lines? See yard drainage solutions.

  • Will the disturbed area be sod, interlock or gardens? Stockpile and protect good topsoil.


7. Choose the right excavation contractor


  • WSIB coverage and liability insurance

  • Experience with your type of project and soil

  • A written scope covering locates, digging, soil handling, backfill, grading and cleanup

  • Clear communication about schedule and weather delays


Common excavation projects we handle


  • Additions, garages and new build site prep

  • Footing and foundation digs

  • Trenching for drainage and services

  • Grading and land clearing

  • Inground pool removal and backfill

  • Commercial site preparation


Frequently asked questions


Do I need to call before I dig even for small jobs?


Yes. Planting trees, installing fence posts and building decks all require locates.


Can excavated soil be reused on my property?


Often, yes. Reusing soil for backfill and grading is encouraged and usually the most cost-effective option.


How long does residential excavation take?


Small digs can take a day; larger additions or site prep can take several days to weeks depending on soil, water and access.


What areas does SPM serve?


London, St. Thomas, Strathroy, Komoka, Ilderton, Dorchester, Kitchener, Waterloo, Guelph and the Lake Huron shoreline.


Book your excavation project


SPM Landscape & Excavation has been digging, grading and preparing sites across Southwestern Ontario since 2006. Call or text (519) 474-0008 for a free quote.


Comments


(519) 474-0008

©2022 by S.P.M Landscape

bottom of page